Welcome » Historic Restorations » Covered Bridges » Carlton Bridge, Swanzey, NH 1997

Carlton Bridge, Swanzey, NH 1997

The $325,886 scope of work included: new stone abutment, total disassembly, replacement of approximately 60% of decayed truss members, new roof assembly, new floor assembly, re-work of integral timber bracing system, and extensive miscellaneous metal connectors and bracing system.


Back to Covered Bridges