Arlington School 

This project consisted of structural and insulation upgrades to the existing Gym and Locker Room area of the Arlington High School, along with minor bathroom and Nurse's area upgrades at the neighboring Fisher Elementary School. The existing roof structure was removed from the trusses up and additional new bars joists were added. SIP panels were installed over the roof framing and a new asphalt shingle roof was installed. Three inches of rigid insulation and new metal siding were added at the existing block walls, which lacked any insulation.