Mt Holly Culvert

This project consisted of repairing an old granite block arch culvert that suffered damage in Tropical Storm Irene. Several of the granite blocks were slipping out of place. We poured in place new concrete footings at the base of the arch and then a rebar mat was installed and shotcrete was applied in  8” to 12” of thickness over the arch portion creating a new concrete arch culvert.